A practical way to track design work is to record each session against a client, project, design phase, and scope status. Add a revision round ID whenever the work involves client feedback. A timer or a spreadsheet can both work; what matters is having enough detail to separate the original brief, included changes, and extra requests.
A total like “27 hours” tells you very little on its own. It doesn’t say which hours belonged to the agreed work, which went to included revisions, and which came from a client changing direction after sign-off. Label those as you go, and two things get easier: working out what a project really paid per hour, and having a calm, specific conversation when feedback runs past what was agreed.
One distinction runs through this whole guide. Hours you track, hours you can charge a client for, and any extra amount a client actually owes are three separate things. The first is a record of what happened. The second and third depend on your agreement and on any changes the client approved. A time log never creates a debt on its own.
Agree on the Rules Before the First Timer Starts
A time log is only as useful as the agreement behind it. If nobody defined what a revision round is, or who can approve a change, you end up with accurate hours and nothing to compare them against.
Before work begins, get these points written down in a graphic design proposal template, signed contract, or confirmation email:
- Deliverables and file formats
- The pricing model: fixed fee, hourly, or a mix
- Project phases, such as discovery, concepts, production, and handoff
- Planned hours, kept as an internal estimate unless your agreement says otherwise
- The number of included revision rounds, and what counts as a round
- How a change gets approved: who can approve it, that it happens in writing, and that it happens before the extra work starts
Freelancers Union’s public Contract Creator includes an optional revisions and changes clause. It lets the parties state how many revisions are included, what additional fees apply, what the deadlines are, and that materially changed services and fees need prior written consent. That is a sample clause, not something automatically present in your agreement or required everywhere. It shows the kind of terms worth settling up front.
One way to define a round is as a single consolidated set of feedback from the client’s authorized approver, rather than every message that arrives. Treat that as a suggestion to adapt. It isn’t a standard. This guide provides general information, not legal advice, and contract terms vary.
Build a Log That Captures Revisions, Not Just Hours
You don’t need special software. Whatever you use, each entry should answer the same questions.
| Field | What to enter | Why it helps |
|---|---|---|
| Date | The day the work happened | Lets you rebuild a week or a month |
| Client and project | Short, consistent names | Keeps totals clean when you switch clients |
| Design phase | Discovery, research, concepts, production, revisions, handoff, admin | Shows where hours actually go |
| Revision round ID | R1, R2, R3, or blank for original scope | Separates included rounds from extra ones |
| Work description | One specific line, such as “Adjust wordmark spacing per feedback email” | Still makes sense months later |
| Duration or start/end | Decimal hours or timestamps | Feeds the totals |
| Time type | Client work or internal | Keeps your own admin out of client summaries |
| Scope status | In scope, included round, authorized change, or outside scope with no fee | Records how the work relates to the agreement |
| Approval reference | The proposal clause, email date or change request that covers the work | Points to the written record |
Timer apps already cover most of this. Toggl Track’s documentation on what’s in a time log lists a description, task, project, tags, date, duration or start and end times, and a billable flag. The revision round ID and approval reference are additions suggested here for design work, not fields any tool requires. If your timer supports tags, a tag can carry the round ID. If it doesn’t, start the description with it, like “R1: adjust wordmark spacing.”
Notice there’s no column called “owed.” A billable flag is useful, but treat it as a bookkeeping label. Whether a tracked hour becomes something a client pays for is decided by your pricing model and any approved changes.
Here are a few illustrative rows from a fictional brand identity project.
| Date | Phase | Round | Work description | Duration | Time type | Scope status | Approval reference |
|---|---|---|---|---|---|---|---|
| Mar 11 | Concepts | none | Sketch three logo directions | 2.5 h | Client work | In scope | Signed proposal |
| Mar 13 | Client communication | none | Kickoff follow-up call and notes | 0.5 h | Client work | In scope | Signed proposal |
| Mar 18 | Revisions | R1 | Adjust wordmark spacing and palette per consolidated feedback | 2.0 h | Client work | Included round | Proposal, revision clause |
| Mar 19 | Admin | none | Update invoice template | 0.5 h | Internal | Not client work | None needed |
These are selected sample rows, not the complete 24-hour project log used later. The 0.5-hour internal invoice-template entry is separate from the tracked project hours. Keep a proposed revision in a change-request tracker until work actually begins; once work happens, record its time and approval status in the time log.
Make Logging a Daily Habit and Review It Weekly
Switching between clients, remembering small tasks, and responding to a new design direction can make a log difficult to maintain. A simple routine reduces the chance that short sessions and revision work disappear into an unhelpful total.
A few habits keep the log honest:
- Stop the timer when the project changes. That includes the “quick two-minute fix” for a different client.
- Log client calls and messages under the client’s project. Log your own invoicing, file organizing, and software updates as internal time.
- Don’t invent a log after the fact. If a session went unrecorded, rebuild it from file save times, calendar entries, and sent messages, then mark it as estimated.
- Don’t round up silently. A billing increment is a term of your agreement, not a logging habit. Log the actual time and let the invoice follow whatever the agreement says.
Once a week, spend ten minutes on a review:
- Every entry has a project, a phase, and a description specific enough to make sense in three months.
- Revision entries carry a round ID.
- Estimated entries are marked as estimates.
- Internal time is separated from client time.
- Any “proposed change request” has a written decision or a scheduled follow-up.
- For each active project, compare planned hours with logged hours, and note the gap.
- Upcoming invoices include only items covered by the agreement or an approved change.
Sort Feedback Before You Log It
Feedback is not all one thing. If you log everything as “revisions,” the log can’t tell you whether you’re inside the agreement or outside it.

| Type of request | What it looks like | How to log it | Where the fee question goes |
|---|---|---|---|
| Included revision | Feedback on delivered work, within the rounds in your agreement | Round ID (R1, R2), status “Included round” | Follows your agreed terms |
| Correction of your own error | A misspelling, an off-spec export, a file that didn’t match the brief | Phase “Correction,” no round ID | Depends on your agreement, but logging it separately keeps it from using up a round |
| Scope change | A new direction, an extra deliverable, or a round beyond the included number | Next round ID in the change tracker; status “Proposed” until approved | A change request before the work starts |
| Separately authorized task | A distinct request, such as a social media kit added after delivery | Its own task label and reference | Handled under its own approval |
The hard cases sit between a tweak and a new direction. A useful test is whether the request refines work inside the agreed brief or changes what was agreed. Nudging a logo lockup is refinement. Replacing an approved concept with a different idea is a change.
When a request lands on the scope-change line, say so plainly and early. Here is an example of a short, non-adversarial note. It’s a starting point, not legal boilerplate, and the numbers match the worked example below.
Hi [Name], thanks for the new direction on the color palette and logo lockups. Our agreement includes two revision rounds, and we’ve completed both. This request goes beyond that scope, so I’d like to handle it as an additional round. I estimate it at about 3 hours and would quote $225 for it. If that works for you, please reply to confirm in writing and I’ll start right away. If you’d rather stay with the current scope, I’m happy to finalize what we have.
Notice what the note does. It names the agreement, provides an estimate before any work begins, and requests a written response. The client can say yes, say no, or ask questions, and nobody is surprised later.
A Worked Example: One Fixed-Fee Brand Identity Project
Everything in this example is fictional and illustrative. The figures aren’t market rates, contract recommendations, or legal rules.
Say a brand identity project has a fixed fee of $1,800. The hypothetical agreement includes two rounds of revisions. That number is made up for the example and isn’t a standard.
Tracking actual hours on a fixed-fee project does not automatically change the agreed fee. It lets you compare estimated hours with actual work so you can better understand the project’s economics and make a more informed estimate next time. An overrun alone does not approve issuing an extra invoice.
The log for the original scope adds up like this:
| Category | Tracked hours |
|---|---|
| Briefing and discovery | 2.0 |
| Research and reference gathering | 3.5 |
| Concept development | 6.0 |
| Design production | 7.0 |
| Client calls and messages | 1.5 |
| Included round R1 | 2.0 |
| Included round R2 | 1.0 |
| Export and handoff | 1.0 |
| Total original scope | 24.0 |
The baseline is $1,800 ÷ 24 hours = $75.00 gross revenue per tracked hour.
Then the client asks for a third round, R3, which would take 3.0 additional hours. Under the hypothetical agreement, that falls outside the included rounds and needs separate written approval. What happens next has two possible outcomes, and they are alternatives on the same project, not two bills.
Outcome A: the 3 hours are worked with no additional fee approved. Total tracked time becomes 27 hours, and the fee stays $1,800. That works out to $1,800 ÷ 27 = $66.67 per tracked hour, about $8.33 less than the baseline.
Outcome B: an additional $225 is explicitly approved before the extra work starts. Project revenue becomes $1,800 + $225 = $2,025, and $2,025 ÷ 27 = $75.00 per tracked hour. The $225 add-on equals $75 for each of the 3 extra hours, which is why the figure returns to the baseline. That is a property of these sample numbers, not a pricing recommendation.
| Scenario | Tracked hours | Project revenue | Gross revenue per tracked hour |
|---|---|---|---|
| Original scope only (baseline) | 24.0 | $1,800 | $75.00 |
| Outcome A: R3 worked, no added fee approved | 27.0 | $1,800 | $66.67 |
| Outcome B: R3 worked, $225 approved in advance | 27.0 | $2,025 | $75.00 |
These are gross revenue figures per tracked project hour, not profit or a business-wide hourly earnings rate. They exclude expenses such as software, font, and stock licenses, as well as untracked or separately classified business overhead. The internal admin entry in the earlier sample table is not included in these 24 project hours.
Outcome A can still be a legitimate choice. A designer might absorb a small extra round for goodwill. What matters is that the log says so honestly, with the status “outside scope, no fee approved,” instead of quietly hiding the cost.
A separate revision tracker keeps the decisions readable. The following dates and references are fictional, just like the project. The final R3 row applies only to Outcome B, where written approval was received.
| Revision ID | Status | Date | Note | Reference |
|---|---|---|---|---|
| R1 | Included | Mar 18 | Consolidated feedback on logo concepts, 2.0 h logged | Fictional feedback email |
| R2 | Included | Mar 20 | Second consolidated feedback set, 1.0 h logged | Fictional feedback email |
| R3 | Proposed | Mar 22 | New color direction requested, estimated 3.0 h, outside agreed scope | Fictional change request |
| R3 | Authorized (Outcome B only) | Mar 23 | $225 add-on; work starts after written approval | Fictional written approval |
The time log supports the conversation by showing what happened and when. It is not the authorization. In this illustrative example, the separate written change approval records the client’s agreement to the extra round and fee. In Outcome A, no add-on is approved, so the authorized R3 row does not apply.
From Log to Client Summary or Invoice
What goes on an invoice depends on the pricing model, not on the raw hours.
On a fixed-fee project, the invoice follows the agreed fee schedule. The time log is mostly for your own analysis, though a short activity summary can be a courtesy if the client asks. In Outcome B above, the invoice would show the $1,800 project fee and a separate line for the approved R3 add-on, with the approval date, for $2,025 in total.
For an hourly project, build the invoice only from entries chargeable under your agreement. Grouping them by project, phase, or task can make a client summary easier to understand.
Internal and nonbillable work belongs in the log but not in the client invoice. Harvest’s official nonbillable-time guidance explains how its reports retain nonbillable hours for internal cost calculations while excluding them from invoices. Other systems may handle these labels differently. Keep unapproved extra work off an invoice until the agreement and any change authorization support the charge.
Spreadsheet, Timer or Project Board: Choosing a Method
These are methods with different trade-offs, not a product ranking. None of them was tested for this guide.
| Method | Works well when | Watch out for |
|---|---|---|
| Spreadsheet | You want full control over columns like round ID and approval reference | Everything is manual, so entries depend on your memory and discipline |
| Timer app | You switch tasks often and want start and stop captured as you work | Fields vary by app, so check that you can record round IDs, for example through tags |
| Project board | You want review stages and approvals visible to the client | Time tracking depends on the tool, so confirm it before relying on it |
A mix is perfectly workable. A timer captures the hours, and a spreadsheet holds the revision tracker and approval references. That’s a reasoned suggestion, not a tested workflow.
Mistakes That Weaken a Time Log
- Logging “design” for everything. Without phases and round IDs, the log can’t answer the questions that matter.
- Reconstructing the week on Friday evening. Memory smooths out interruptions and short tasks, and the totals drift.
- Treating the log as an invoice. Tracked time and chargeable time are different things.
- Leaving “round” undefined. If you and the client don’t agree on what a round is, counting rounds settles nothing.
- Letting a verbal yes stand in for approval. A quick message confirming the change and the fee takes a minute and avoids a dispute later.
- Hiding internal time. Admin and corrections are part of a project’s real cost, so log them and flag them as internal.
- Rounding up without an agreed increment. It makes the log less trustworthy to you and to anyone who sees it.
Quick Checklist and a First Step
Before the project starts:
- Write down deliverables, the pricing model, phases, and included rounds.
- State the change approval process, including who can approve.
During the project:
- Every session has a project, phase, description, and scope status.
- Revision entries carry a round ID.
- Unrecorded time is marked as estimated.
At the end of each week:
- Pending scope changes have a decision or a follow-up.
- Compare planned hours with logged hours.
- Only approved items are headed for invoices.
A practical first step today is to open a blank spreadsheet, paste in the field names from the table above, and log the project you’re working on right now. Then check whether your current agreement defines a revision round and a change approval process. If it doesn’t, add both to your next proposal.
Frequently Asked Questions About Design Time Tracking
Should I track hours on a fixed-fee design project?
Yes. Tracking actual project hours helps you compare the agreed fixed fee with the time the work took. It does not automatically change what the client owes. For example, a fictional $1,800 project taking 24 hours represents $75 in gross project revenue per tracked hour, before costs and other business time.
Does tracking extra revision hours make them billable?
No. A time log shows what work happened, not whether a client agreed to pay extra. Whether additional revisions are chargeable depends on the proposal or contract and any separately authorized changes. When extra scope or fees need approval, request written confirmation before starting that extra work.
How should designers record client revision rounds?
Give each agreed round an identifier such as R1 or R2, log the tasks and time against it, and note whether it is included in scope. Keep requests that exceed the agreement as proposed until the client authorizes them. Save the relevant email or approved change reference alongside the record.